
GM fuel-pump wire colors are not a universal selection or installation key. Confirm the VIN-level platform record, model year, connector view, circuit diagram, and module scope before any parts review.

- FAQs
Part 1. Why is a GM wire-color search incomplete?
A color label by itself does not identify a circuit function, connector cavity, or component revision. Platforms, model years, harness options, and repairs can alter the records a technician or buyer must verify.
Part 2. What records identify a pump circuit?
Use the vehicle identification, model year, powertrain or fuel-system context, connector view, and the applicable wiring diagram as one evidence set. The fuel-pump relay function guide explains why a relay-related symptom and a pump request should not be treated as the same diagnosis.
| Record | What it confirms | Do not replace it with |
|---|---|---|
| VIN and model-year context | the platform record to review | a generic GM search result |
| Circuit diagram | function and documented routing | a color-only list |
| Connector view and part reference | cavity and assembly evidence | an unlabelled photo |
Part 3. Which connector details should be compared?
Compare connector body shape, cavity count, locking features, terminal condition, harness-side reference, and any module interface record. These observations are procurement inputs, not a substitute for a manufacturer diagram.

| Connector evidence | Buyer should record | Review purpose |
|---|---|---|
| Clear front and rear images | orientation and cavity count | identifies the interface |
| Harness or module reference | printed or documented identifier | connects evidence to the request |
| Diagram revision | source and applicable platform | controls interpretation |
Part 4. Why must color labels be verified?
Color conventions can be misread, changed, repaired, or copied incorrectly across applications. A wiring request should therefore preserve the original circuit-document reference instead of converting a search result into a pinout.
Important: Do not use an unverified online color list as a vehicle wiring instruction; confirm the applicable factory documentation and safety requirements before electrical work. (GM owner information entry point)
Part 5. How should a harness request be separated from a pump request?
A harness repair, relay diagnosis, connector pigtail, pump motor, and full module can be different requests. The fuel-pump location overview helps frame the platform and module context before an assembly is discussed.
Part 6. What technical inputs belong in an RFQ?
Send only documented identifiers and images that can be traced to the vehicle or component. An incomplete record should remain a technical review, rather than become a guessed wiring or fitment recommendation.
| Buyer should provide | Why it matters | Send with RFQ |
|---|---|---|
| VIN-level platform and model-year record | identifies the documentation context | Yes |
| Wiring-diagram source and revision | supports circuit review | Yes |
| Connector and module images | shows physical interfaces | Yes |
| Part, harness, or OE reference | links the request to evidence | Yes |
| Quantity and required documents | defines procurement review | Yes |
Part 7. How should Kangsong receive a documented inquiry?
Start at Kangsong fuel pump products to identify a relevant family, then use Contact Kangsong for the model, documented circuit context, connector evidence, quantity, and required records.

FAQs
Are GM pump wire colors universal?
No. Platform, model year, harness option, and revision evidence must be verified for the specific vehicle.
Can connector photos replace a diagram?
No. Photos help document the interface, while the applicable diagram is needed to interpret the circuit safely.
Does a relay symptom prove a pump fault?
No. A relay-related symptom needs its own documented diagnostic review and does not prove the pump is faulty.
Which vehicle identifiers are useful?
Use the VIN-level platform record, model year, powertrain or system context, and documented component references.
Can a color list support installation?
Not by itself. Installation work must follow the applicable factory documentation and safety requirements.
When should a request stop?
Stop and request records when the platform, diagram, connector, or component reference cannot be verified.
